testfit for data center

Optimize Your Data Centers
for the Best Option

Quickly and accurately determine the feasibility of your Data Centers so you can compete for sites with the right power availability fast.

See It on Your Site

Generate Design Options with Energy Availability

Optimize for estimated electricity availability with Generative Design by inputting a maximum and minimum megawatt (MW) limit.

Customize Your Data Center with Custom Data

Set custom parameters like target power density, design PUE, and front and back yard depths to create a tailored Data Center layout.

Access Power Plant Data in Real-Time

See regional energy infrastructure with accurate locations and detailed information about power plants and their energy sources.

3,300+

Users Win Deals on TestFit

$90k Savings Per Year on Feasibility

I sat down one weekend and did a 65-acre development site plan in 3-4 hours and later this complicated mixed use project in 1.5 hours. Before, it would take at least a week of back-and-forth revisions and cost us thousands of dollars.

Dan O’Berski
Partner
 at 
Trinity Commercial Group

Win $750k in Fees with TestFit

We’re actively marketing TestFit as our competitive advantage to win new projects, which has resulted in winning over $750K in project fees. A lot of the projects we would not have worked on without TestFit.

Thomas Retnauer​
President
 at 
RBA Architects

Get the Same Job Done 10x Faster

5 years ago, I got 2 or 3 of these jobs done in a week if I worked 60-80 hours. Now, with TestFit, I can get the same job done in just 2 hours. That’s the difference between me putting out 100 jobs a year versus 400+ a year—it pays for itself pretty quickly.

Rich Giddens
Site Analysis and Design
 at 
TruSteel Buildings

Save $200k-$300k in Non-Billable Hours

TestFit has allowed us to win over developer partners while saving over $200k in labor hours. We can easily provide our clients with quick studies as they vet out sites to see if the sites are the right fit for them based on the data we can find in TestFit like the cost of yield, number of units, square footage, and more.

Grant Brandenburg
Director of Regional Operations
 at 
Ware Malcomb

$5k Saved per Project Won

With TestFit, we can produce 2-3 times more alternative models on a fixed budget. With a $10,000 budget for building modeling, we could create 37 models, whereas before we could only create 15.

Jamin Kimmell
Partner
 at 
Cascadia Partners

Maximized a 19-acre Site's Potential in Hours

In the design sessions, we can get to a massing or a yield that’s probably within 10 to 15% margin of error, oftentimes in 30 minutes or an hour. That usually takes weeks with a traditional design process.

Michael Bernstein
Development Manager
 at 
The Geyser Group

Plan Data Centers in Seconds with
TestFit Generative Design

Fast-track your feasibility studies with real-time insights on design, cost, and constructability all in one place.

Built For Data Centers

Infill Development

Plan for multi-level data centers with data halls, electrical rooms, admin areas, and mechanical yards.

Account for various types of data centers and cooling technologies with our parameter-driven target power densities and design PUE's.

Campus Centers

Solve massive acreage for campus developments. Divide up your prospective land into phases or zones for various Data Center types.

Design major roadways and plan for substation layouts all while automatically allocating for maximum buildable area.

TestFit is transformational. We've shaved days off of our analysis by using the AI capabilities of this software, which allows us to make smarter decisions faster.

Luke Peters
Vice President of Development
 at 
Prologis

With TestFit, we can produce 2-3 times more alternative models on a fixed budget. With a $10,000 budget for building modeling, we could create 37 models, whereas before we could only create 15.

Jamin Kimmell
Partner
 at 
Cascadia Partners

The speed to bring a visual rendering is where we best utilize TestFit. We utilize it in real-time with the client. The client quickly sees how we could develop the land or check on the maximum available building area.

Chris Carry
Sitework and Heavy-Highway Department Manager
 at 
Mosser Construction

Reduce Risk. Increase Potential.

Explore TestFit's Real Estate Feasibility Platform today.

Buy Now