How Ware Malcomb Uses TestFit as a Marketing Tool to Win Projects
Case Study
83% Decrease in Site Planning Time
Discover how Ware Malcomb reduced their site planning time from 3 days to 1/2 a day, resulting in better client experience and more wins for multi-family projects.
$200-300k Saved in Non-Billable Hours
Learn how Ware Malcomb leverages TestFit’s co-authoring ability to save labor hours in creating free feasibility studies for developer clients.
2D to 3D in Seconds
Explore Ware Malcomb’s favorite feature at TestFit—visualizing 3D massing in context while site planning in 2D—and quickly creating polished renderings for presentations.
Download the Case Study
“We made a goal to seek out more multi-family work, and TestFit has allowed us to win over developer partners while saving over $200k in labor hours. We can easily provide our clients with quick studies as they vet out sites to see if the sites are the right fit for them based on the data we can find in TestFit.”
Grant BrandenburgDirector of Regional Operations, Ware Malcomb
How Resia Accelerates the Mission of Lowering Housing Prices with TestFit
Case Study
4x Faster in Site Planning
Discover how Resia saved time in site planning by moving from CAD to TestFit—eliminating all the time sending files back and forth to make even minor changes on a plan.
98% Increase in Time Saved on Deals
Explore how Resia’s land acquisition team reduced the amount of time spent on getting underwriting done from 2 weeks to 2 hours, while analyzing 6-12 scenarios all at once.
300% Increase in Productivity
Learn how their 1-person team using TestFit got a site plan done much faster than a 4-person team.
Download the Case Study
“At Resia, we’re always looking to streamline the process from land acquisition to construction to help solve housing prices for the workforce middle class. TestFit helps us meet that mission efficiently by accelerating our site planning efforts 4x faster.”
Selma RabeloVP of Corporate Product, Compliance & Innovation
How The Geyser Group iterated on site plans for the 19-acre St. John site
Specific RFP requirements
The RFP for the 19-acre St John site had multiple facets that required intense manipulation of the designs to get the best possible yield, both in terms of units, affordable housing, and sizeable greenspace.
Site challenges
This case study delves into how The Geyser Group & team optioneered against the specific constraints of the site, including an interstate highway, access issues, water detention, demolition / reuse & compatibility requirements such as building height graduation.
Discover the process
Learn how the designing teams used an iterative design process with TestFit to bring their vision to life, while achieving the unit counts required to accommodate both affordable housing requirements, and respecting height limitations.
Learn how The Geyser Group successfully optioneered with TestFit
Download the case study
“We find TestFit hugely beneficial for going from zero to a pretty good understanding of what we can put on a site. The TestFit platform allows us to quickly understand the yield on land sites, and confidently make offers based on that data. We would not have been able to get through as many iterations as quickly, and we probably wouldn’t have been able to realize as much yield out of this site without TestFit.”
Michael Bernstein - Development Manager at The Geyser Group, Austi, TX