How Ware Malcomb uses TestFit as a Marketing Tool to Win Projects

Ware Malcomb TestFit Model

How Ware Malcomb Uses TestFit as a Marketing Tool to Win Projects

Case Study

83% Decrease in Site Planning Time

Discover how Ware Malcomb reduced their site planning time from 3 days to 1/2 a day, resulting in better client experience and more wins for multi-family projects.

$200-300k Saved in Non-Billable Hours

Learn how Ware Malcomb leverages TestFit’s co-authoring ability to save labor hours in creating free feasibility studies for developer clients.

2D to 3D in Seconds

Explore Ware Malcomb’s favorite feature at TestFit—visualizing 3D massing in context while site planning in 2D—and quickly creating polished renderings for presentations.

Download the Case Study

From parcels to test fits in seconds

How Resia Accelerates the Mission of Lowering Housing Prices with TestFit

How Resia Accelerates the Mission of Lowering Housing Prices with TestFit

Case Study

4x Faster in Site Planning

Discover how Resia saved time in site planning by moving from CAD to TestFit—eliminating all the time sending files back and forth to make even minor changes on a plan.

98% Increase in Time Saved on Deals

Explore how Resia’s land acquisition team reduced the amount of time spent on getting underwriting done from 2 weeks to 2 hours, while analyzing 6-12 scenarios all at once.

300% Increase in Productivity

Learn how their 1-person team using TestFit got a site plan done much faster than a 4-person team.

Download the Case Study

From parcels to test fits in seconds

Case Study: TestFit for Urban Redevelopment

TestFit for urban redevelopment

How The Geyser Group iterated on site plans for the 19-acre St. John site

Specific RFP requirements

The RFP for the 19-acre St John site had multiple facets that required intense manipulation of the designs to get the best possible yield, both in terms of units, affordable housing, and sizeable greenspace.

Site challenges

This case study delves into how The Geyser Group & team optioneered against the specific constraints of the site, including an interstate highway, access issues, water detention, demolition / reuse & compatibility requirements such as building height graduation.

Discover the process

Learn how the designing teams used an iterative design process with TestFit to bring their vision to life, while achieving the unit counts required to accommodate both affordable housing requirements, and respecting height limitations. 

Learn how The Geyser Group successfully optioneered with TestFit

Download the case study 

From parcels to test fits in seconds